Feature
|
Consent to Establish (CTE)
|
Consent to Operate (CTO)
|
Purpose
|
Initial Approval: Grants permission to an industry, project, or process to begin construction, installation, or setup activities. It assesses potential environmental impact before physical establishment.
|
Operational Approval: Authorizes an established industry to commence actual production or operation. It confirms that the unit is ready to function in compliance with environmental standards and has implemented the approved pollution control measures.
|
Timing
|
Pre-Construction/Pre-Establishment: Must be obtained before any physical construction, civil work, or installation of machinery begins.
|
Post-Construction/Pre-Operation: Obtained after the industry has been established, pollution control systems are in place, and the unit is ready to start its core operations.
|
Focus
|
Focuses on the proposed project. It evaluates the site suitability, planned layout, proposed manufacturing process, and the design/plan for pollution control measures (e.g., blueprints for Effluent Treatment Plants - ETPs, Air Pollution Control Devices - APCDs).
|
Focuses on the actual operations and implemented systems. It verifies that the installed pollution control equipment is working effectively, that the industry is adhering to discharge and emission limits, and that waste management protocols are being followed.
|
Validity
|
Typically granted for a period of 3 to 7 years, or until the plant is commissioned, whichever is earlier. It's a one-time approval for the establishment phase. Extensions may be granted if the project isn't completed within the initial validity.
|
The validity period varies based on the industry's pollution category:
Red Category: Usually 5 years
Orange Category: Usually 10 years
Green Category: Usually 15 years
CTO needs to be renewed periodically to ensure ongoing compliance.
|
Key Documents
|
Project Report, Site Plan/Layout Plan, Ownership Documents, Details of Manufacturing Process, Proposed Pollution Control Measures, Water Balance Details, Capital Investment Details. (For projects requiring EC, the EC document also becomes critical).
|
Compliance report with CTE conditions, Latest Analysis Reports of Effluents/Emissions/Waste, Details of Installed Pollution Control Systems, Environmental Statement, Balance Sheets, Audit Reports (if applicable).
|
Inspection
|
May involve a pre-construction site inspection by the SPCB/PCC to assess feasibility and proposed measures.
|
Involves post-construction/pre-operational inspections to verify the proper installation and functioning of pollution control equipment and overall compliance.
|
Legal Basis
|
Both are mandated under the Water (Prevention & Control of Pollution) Act, 1974, and the Air (Prevention & Control of Pollution) Act, 1981, and relevant environmental rules.
|
Both are mandated under the Water (Prevention & Control of Pollution) Act, 1974, and the Air (Prevention & Control of Pollution) Act, 1981, and relevant environmental rules.
|
Consequences of Non-Compliance
|
Starting construction or establishment without CTE is illegal and can lead to penalties, including fines, stop-work orders, or even demolition orders.
|
Operating without a valid CTO is illegal and can result in severe penalties, including fines, plant closure, disconnection of essential services (power/water), and legal prosecution.
|